Daylight anchors the working area in this indoor kitchen. The two films move from close views of the worktop and sink to a wider view of the cooking, washing and preparation zones.
Layout and use
The sink sits below the dark-framed window. Cooking equipment occupies the adjoining side, while the opposite return provides extra preparation space and storage. Upper cabinets extend over the dry work area.
Materials and finishes
Pale flat-panel fronts, silver-toned metal work surfaces and a metal sink create a restrained palette. Grey tiled walls and floors tie the separate runs together. Material grades and exact panel construction belong in the approved specification rather than being assumed from appearance.
Craft details
The worktop returns and sink opening are fitted to the room, with a neat rear upstand against the tiled wall. Consistent base-cabinet lines and the dark plinth connect the different working zones. The storage arrangement balances full-height upper units with an open window area.
Production programme
Production is planned within 30 days following approval of the final drawings and materials. Transport and on-site fitting are outside this production period.
