← Projects

YUZE / Projects

The details behind the front

An assembly-stage inspection shows drawer boxes, runners and cabinet interiors beneath a pale worktop, with protective film still in place.

Film 01 / 01

This film documents cabinetry during an assembly and function check. Protective film and temporary labels remain on several fronts, giving an honest view of the product before final cleaning and handover.

What the film shows

Doors and drawers are opened in sequence to reveal the storage compartments and movement of the fittings. A sink cabinet sits below the light-coloured worktop. The focus is on the interior construction and access rather than a styled finished room.

Materials and finishes

The visible components include grey-toned cabinet fronts, metal drawer parts and hardware, a pale work surface and a metal sink. Protective coverings partly conceal the final front finish. Material grade, worktop composition and hardware specification are confirmed in the approved schedule.

Assembly details

The sequence highlights drawer-box fit, runner alignment, door clearances and the relationship between the pull line and the worktop edge. These are useful points to review during assembly before protective film is removed and the cabinet is prepared for handover.

Production programme

Production is planned within 30 days after final drawings and materials are approved. Inspection forms part of the production programme; transport and on-site installation are separate.

YUZE

Have a space in mind?

Share a sketch, dimensions or an idea. Let’s start planning your outdoor kitchen.

Discuss your project